Caiso master file. This can be done for Generator resourc.

Caiso master file Jul 22, 2019 · This additional functionality included changes to the Master File to help identify hybrids and the ability to process dynamic limits to more effectively manage hybrid resources. Validating master file inputs for resources submitted by scheduling coordinators has been problematic in the past in many cases. Resource When Resource Type = Pre Defined or Custom Oct 15, 2019 · The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. 8. Home Industries and Topics Electrical Energy Electric Power Procurement Resource Adequacy Homepage Resource Adequacy Compliance Materials Resource Adequacy Compliance Nameplate Capacity is shown as “Net Dependable Capacity” in the CAISO Master Generating List file. 8. Mar 15, 2018 · This user guide explains how to use the Master File User Interface for submitting these data changes, viewing and downloading approved RDT or ULPDT data for a selected effective trade date, and viewing and downloading a list of resources with upcoming approved changes for specified date range. The Master File is a general repository of quasi-static data needed to operate and support the CAISO Markets. NQC values are “Estimated September NQC” and subject to change based on counting rules or changes to resource configurations. Depending on resource capabilities, market participants can elect to bid into the energy and ancillary services market or sell other electricity products. The extended day-ahead market (EDAM) will improve market efficiency by integrating renewable Sep 17, 2024 · The California ISO has posted the Final 2025 Resource Adequacy Net Qualifying Capacity (NQC) list to the resource adequacy page, under the Net qualifying capacity (NQC) and effective flexible capacity (EFC) heading. Jul 18, 2025 · 2025 Schedules for Full Network Model Database Release The California ISO’s Full Network Model (FNM) implementation process has specific critical dates to meet in order to include corresponding changes to the Full Network Model. 0 CAISO Tariff Section 11. FERC ordered the following penalties and disgorgements: In the CAISO’s Market, a Wheeling Through transaction consists of an Import Bid and a Export Bid with the same Wheeling reference. ” Section 10 of this BPM Jan 23, 2025 · “Required to notify the CAISO within sixty (60) minutes after discovering any change in the maximum output capability of at least ten (10) MW or five percent (5%) of the value registered in the Master File, whichever is greater, May 10, 2016 · The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. For direct access to specific applications, go to the Market Participant Portal. DMM also requests the ISO detail the appropriate use of dynamic limits for storage resources to manage foldback and nonlinearities in the CAISO Tariff. The SC of the resource submits a proposed QC value to the California ISO, along with a reference to the resource’s most recent maximum power plant output (PMax) test8 that is in California ISO’s master file. 21, 2019. The ISO has in some cases taken the position that it is not possible for the ISO to validate master Oct 4, 2021 · The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. The Revised Draft Final Proposal provides that the election to utilize EA will be made in the CAISO Master File and any changes to that election will occur through the existing Master File process. If 3-party , look-up CAISO Queue Position number here and enter Queue # below, if multiple Queue numbers apply to this project separate with a comma. xlsx May 24, 2022 · The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. The status of each RUC Zone shall remain active for as long as the CAISO‟s Automated Demand Forecast System (ALFS), or its successor, maintains such regional forecasting capabilities. In Nov 2, 2023 · AES’s registration of inaccurate Master File Pmax values, bidding up to the Resources’ Master File Pmax value in CAISO markets, and selling capacity through RA contracts that could not reasonably be provided, were in violation of the CAISO Tariff. [2] Note: If a resource cannot maintain the PMax and PMin value registered in the CAISO Master File for the duration of the test, the Scheduling Coordinator is responsible for submitting an appropriate outage on the unit and/or appropriate updates to the Master File to reflect the physical capability of the unit. Sep 9, 2024 · California ISO Provided Self-Paced Learning Resources The California ISO has created a library of Computer-Based Training (CBT) courses to inform market participants and stakeholders on a wide range of topics. The Master Resource Database (MRD) is a compendium of all physically identified resources eligible to sell Resource Adequacy (RA) capacity, including both resources in the CAISO balancing area and specified imports. 22 The California ISO manages the flow of electricity across high-voltage, long-distance power lines, operates a competitive wholesale energy market, and oversees transmission planning. Additionally, MFRD provides market participants with the ability to update their information as needed. Master File updates will not be requested until all the required agreements are signed, returned to the CAISO, and igned by a CAISO officer. 2. If Registered Cost is selected for Start-Up and/ or Minimum Load, the SC submits information for Start-Up and/ or Minimum Load respectively to CAISO for entry into the Master File. Portion of the total bid that was bid as self schedule. Generator Modeling Overview CAISO Tariff Section 24. Step 2: After the Bids are successfully validated for content, but prior to the Market Close of the DAM, CAISO carries out the second level validation rules to verify that the Bid adheres to the applicable CAISO Market rules and if applicable, limits based on the content of the Master File. DMM has recommended that the ISO be more proactive at reviewing master file inputs and providing clear guidance regarding master file input to scheduling coordinators. Oct 1, 2024 · EIM Reserves to Meet NERC-WECC Contingency Reserves Requirements 68 Oct 27, 2025 · The following links are to supporting documentation for the applications. e. 4 The CAISO’s market Nameplate Capacity is shown as “Net Dependable Capacity” in the CAISO Master Generating List file. 16. Customer Readiness Acronyms List_MasterCopy. May 9, 2016 · A change that cannot be accommodated through the Master File UI may be submitted by email to RDT@caiso. A. The CAISO’s Master File is the primary source for these operating characteristics on a technology level and The ISO provides open access to the transmission grid, supported by a competitive energy market. Jun 6, 2012 · The Start-Up and Minimum Load Bid components are constant for each Trading Day for the period submitted. Six stakeholders preferred updating resource modeling, with suggestions including explorin Oct 23, 2024 · The VER may be a standalone unit, a component of a Hybrid resource, or a Co-Located resource. The Wheeling Through transaction can be specified Interconnection Request – Appendix 1 Sec. As an interim measure for this summer, SCs are asked to submit to the 3. 1 Day-Ahead Market Validation CAISO’s DAM validation includes validation steps prior to the close of the market, including the update to Master File. These reliability demand response resources can be broken down as follows: Jun 25, 2020 · The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. CAISO Master File has the meaning set forth in the CAISO Tariff. The FNM database release are listed in Table 1. The CAISO master file is a database containing specific resource information that allows the market models to optimize the dispatch of the system at least cost. “Natural Gas” includes Alamitos Unit 7 (675 MW) and Huntington Beach (674 MW) added in Feb 2020. F. May 28, 2025 · When these outage cards are used for nonlinearity, the CAISO proposes the resource include a note in the outage card to state that the outage is related to nonlinearity. ). The submittals showed a total of about 6,314 MW of existing and expected Co-Located renewable resources (excluding storage) in the 2025 timeframe, which were factored into the flexible needs assessment. All NQC values are “September NQC” and subject to change based on counting rules and additions to monthly CPUC NQC Lists. If 3- Oct 3, 2019 · This initiative will develop an approach to extend participation in the day-ahead market to the Western Energy Imbalance Market (WEIM) entities in a framework similar to the existing WEIM approach for the real-time market, rather than requiring full integration into the California ISO balancing area. Access for the various systems is requested once Master File is updated with an ef SCID. These programs also provide rules for counting resources that must be made available to the ISO. “Natural Gas” includes Alamitos Unit 7 (675 MW) and A. Generator Resource Data Template (GRDT) Fuel type = HYBD for mixed fuel resources Completed by Master File Team Modifiable by customer Flags set for hybrid resources NEW The California ISO 2019 Q1 Full Network Model implementation is scheduled for effective trade date Feb. Scheduling Coordinators must submit ramp rates that align with the maximum values registered in the Master File. Apr 21, 2021 · The Master File (MF) contains data for resources participating in CAISO markets. The requirement to provide accurate generating unit data is not just contained in the PGA; it also is contained in the CAISO tariff, which states that “[a]ll information provided to the CAISO regarding the operational and technical constraints in the Master File must be an accurate reflection of the design capabilities of the resources and 1. Purpose This paper addresses the flexible ramping product issues identified in the CAISO Energy Markets Price Performance Report1 published on September 23, 2019. On the Effective Date, the values in the CAISO Master File shall be set equal to the values shown in the table above. A Wheeling Through transaction is identified with a unique wheeling reference ID which is registered in the CAISO Master File. articipating in CAISO markets. Application Programming Interface (API). Resource Owner: (Optional) The owner of the resource (May or may not be the Scheduling Coordinator listed in the From_SC field). 2 requires “Participating Generators [to] provide the CAISO on an annual or periodic basis in accordance with the schedule, procedures and in the form required by the Business Practice Manual any information and data reasonably required by the CAISO to perform the Transmission Planning Process. s for bidding, ter Fi. Find out more about requesting access and certificates. CAISO would likely fill in missing emissions rates and heat rates in order to have an exhaustive accounting of all emissions and energy schedules This could be done with: Existing data from similar resources using data from CAISO Master File Other publically-available data sources May 20, 2025 · 2026 Schedules for Western Energy Imbalance Market Model Data Submission The California ISO’s Full Network Model (FNM) implementation process has specific critical dates to meet in order to include corresponding changes to the Full Network Model. The effective dates shown are the earliest effective trades dates available for a routine change that does not require follow-up. May 30, 2024 · Here you will find information about applications used for ISO planning, market and operations processes. The flexible ramping product2 was introduced in to the real-time market to manage ramp capability to address uncertainty related to load and variable energy resources that materializes between market runs. As discussed in the Resource Adequacy Modeling and Program Design Track 3A: Resource Visibility policy initiative, the CAISO would like to get insight into the contractual status of its fleet. c. Mar 26, 2021 · The resource adequacy and reliability requirements programs provide deliverability criteria that each load serving entity must meet. Prior to the flexible ramping product Jul 18, 2025 · 2025 Schedules for Western Energy Imbalance Market Model Data Submission The California ISO’s Full Network Model (FNM) implementation process has specific critical dates to meet in order to include corresponding changes to the Full Network Model. City: State: Title: Resource ID in CAISO Master File Report Date Back-Up Contact Primary Contact The mapping of RUC Zones to CNodes shall be static data, maintained in the CAISO Master File. Prior to implementation Minimum level of output as registered in the CAISO master file. IMPORTANT NOTE: applicant has 1 year to complete all requirements or the ISO may terminate application and applicant would need to re-apply and submit new fee. To request a custom GDF, please contact the PDR coordinator at pdr@caiso. . Calculated Forecasts – Presently some IOU forecasts include the MSSs. 4. 1 Master File The Master File (MF) contains data fo. r File Update Procedures B. 2. The MRD is also used Once the SC has submitted a request, the Master File analyst reviews the request and determines if the updates comply with stated MF business rules. If no value is registered, the variable storage operations cost will be set to the default value of $0/MWh. The changes must be approved prior to them being made effective within the Master File database. If the updates pass the initial review, the request is presented for further review and approval by affected CAISO systems. This document describes the Market Participant interface to CAISO’s Master File Data Exchange Services. The data is used by CAISO market syst. ” Appendix A of D. May 7, 2021 · The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. Master File Update Holder identifier (SCID). Contract Reference Number (CRN) used for Existing Transmission Contracts (ETC), Transmission Ownership Rights (TOR) or Converted Rights (CVR), as registered in the CAISO Master File, or “NONE” for Market Transmission. These changes may take longer than 5 business days to process. R. 2 Background The Day in the Life Energy Imbalance Market (EIM) document was created to identify specific business functionality and its relevant software integration touch points between the California Independent System Operator (ISO) the EIM operator and the EIM entity. urve, and variable operations and maintenance (VOM) cost. If your resource achieved Commercial Operation Date (COD) during the 2025 Annual Net Qualifying If this interim solution is pursued, DMM requests improvements to Master File to facilitate monitoring of dynamic limit usage for all storage resources. The authorized Scheduling Coordinator (SC) can submit a request to update specific operating parameters for existing generator or intertie resources by submitting a revised Resource Data Template (RDT) via the Master File User The California ISO released Master File version 34. 4. Apr 30, 2018 · The CAISO proposes that the PDR-LSR will facilitate the provision of load curtailment and load consumption by two discrete resources registered in Master File, one resource ID to reflect the operating characteristics of the resources curtailment capabilities and the second resource ID to reflect those of its consumption capabilities. The responsible SC Schedules ETC/TORs using market resources registered as source or sink for the ETC/TOR rights, in the CAISO Master File following existing SIBR rules for these self-schedules. The calculation of Eligible Flex Availability is different than the proposal in order to take into account a zero bid Interconnection Customer will elect to have Co-located Resource modeled utilizing Aggregate Capability Constraint (ACC) located at its Point-of-Interconnection (POI) through a revision to Schedule 1 of the Participating Generator Agreement (PGA) and/or Participating Load Agreement (PLA), and direct scheduling coordinator(s) for the resources to submit market model data to Master File. While the HSL can exceed the Pmax of the resource defined in the ISO’s Master File, it should not exceed the site AC capacity. Both of these CAISO lists also include information related to dynamically scheduled generators, which are physically located outside of the CAISO but can Aug 1, 2024 · 30. Part 314. It provides the WSDL, XSD, and XML information required by application programmers to create and send messages and to process response messages. All applications, excluding OASIS, require a certification. Jan 17, 2018 · As part of the new enhancement, MRI-S will be monitoring the submitted meter values for each market resource by comparing the submitted interval values against the registered PMax value in the CAISO Master File. ents by fuel type within the ISO’s Master File. Note: Data shown here shows a snapshot of new resources added to CAISO grid Q12020 – Q2 2024, including specified CAISO imports. 3. WDAT Number, Rule 21 Number, etc. Portion of the total bid that was bid economically. Purpose This paper summarizes the flexible ramping product issues identified in the CAISO Energy Markets Price Performance Report1 published on September 23, 2019. Master File Update inator identifier (SCID). The ISO will use the posted net qualifying capacity for compliance year 2025. The Baseline Generator List of resources modeled in SERVM consists of online and In-Development resources, consistent with the definition used in the IRP proceeding. This can be done for Generator resourc. A DMF is a submission to the FDA that may be used to provide confidential detailed information about facilities, processes, or articles used in the manufacturing, processing, packaging, and storing of one or more human drugs. Jan 16, 2025 · Interface changes: Changes that impact templates (RA Supply Plan, Master File RDT, etc. As result, the definition of a Short Start Unit must specify the resource that can be started in either the RTUC or the STUC depending on the generating unit’s actual start-up and minimum run time, which is the information the market processes obtain from the CAISO master file. May 10, 2024 · To inform participants of the Full Network Mode releases planned for the 2025 calendar year and to assist with timely provision of materials required for inclusion in the model, the ISO has posted the 2025 implementation schedule with critical milestones and Master File data freeze dates to the RC West Portal and on the ISO’s Network and Aug 18, 2025 · Distribution: Net transfer optimally distributed to individual directional transfers (export/import) between BAAs at specific interties. instructions, and fai ng to provide the required notifi California ISO Tariff. Data shown excludes imports, except where specified. See resource naming guidelines found in the NRI Guide or contact For the Reporting Period, there were Two Hundred and Sixteen (216) participating reliability demand response resources registered in the CAISO Master File. resources . It is a calculated estimate; not a forecast. ISO Task NOTE: Application access request cannot be submitted until Master file has been updated with SCID. Death master file means Jun 8, 2020 · The Master file calendar is a guide to help scheduling coordinators determine the time line required when requesting changes to data maintained in the Master File application. The MRD is used in the CPUC’s Load Serving Entities (LSE) Showing Template to ensure accurate resource representation across Slice of Day (SOD) RA filings. 0 MSS Load following capacity does not exist if a MSS resource elects the RUC option, as indicated in the CAISO Master File. g facility or NGR with the fuel type in the CAISO master file as “Other. Trying to reconnect The Master File is a general repository of quasi-static data needed to operate and support the CAISO Markets. 5/mmBTU gas price and $85/MWh for auxiliary power. The California ISO manages the flow of electricity across high-voltage, long-distance power lines, operates a competitive wholesale energy market, and oversees transmission planning. 841’s requirement to account for storage resources’ specific physical and operational characteristics through biddable and Master File parameters. On OASIS you will find real-time data related to the ISO transmission system and its Market, such as system demand forecasts, transmission outage and capacity status, market prices and market result data. California ISO Resource Control Agreement Disclosure Form ( Tab) 1. As part of the new enhancement, MRI‐S will be monitoring the submitted meter values for each market resource by comparing the submitted values against the registered PMax value in the CAISO Master File. The MRD will be updated annually for deliverability and net qualifying capacity updates. Welcome to the California ISO Open Access Same-time Information System (OASIS) site. CAISO Master File means the master file database maintained by CAISO with respect to the Project. The custom GDF can be deployed based on the Master File deployment. ” This addition of energy storage is comparable to a modification in operating characteristics of the generating The Master File is a general repository of quasi-static data needed to operate and support the CAISO Markets. 1. On a monthly basis, the CAISO will review the Master File Start-up and Minimum Load Cost values for units that had selected the Registered Cost Option to identify resources that have registered cost values over the allowable cap. ET: Export Transfer IT: Import Transfer Definition: Statically defined in Master File to facilitate BA rights or long-term rights holders; dynamically defined in SIBR along with submission of schedule. “Natural Gas” includes Alamitos Unit 7 (675 MW) and Jun 30, 2017 · The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. CAISO Master File Drug Master File or “DMF” is described in 21 C. s on the Generating Resource Data Template (GRDT) or Intertie resources on . The California ISO has posted an updated version of the Master File User Guide and a Frequently Asked Questions (FAQ) document for the Commitment Cost Enhancements Phase 3 market simulation starting on March 26, 2018. Implementation notes: New process for adding sub CRNs to MF (which would be placeholder contracts activated in Internal ISO System when purchase transactions occur. Naming Convention Jun 25, 2020 · The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. Once the MSS forecasts become available, the IOU Load forecasts without the MSSs in their area are used. “Project” is defined as a unique CAISO resource ID. This is the resource name that will be used in the CAISO Master File and in Regulatory Contracts and is subject to CAISO approval. Naming Convention Generating Units The following files lists the generating and storage units modeled in SERVM for various use cases. May 10, 2016 · The Master File (MFRD) provides ISO with the ability to store market participants’ operating parameters data, which is then used in many of its applications. This is accomplished within ALFS, using software from Itron. Mar 1, 2017 · The Master File (MF) contains data for resources participating in CAISO markets. 4 The CAISO’s market Master file contains resource specific information including: Pmin, Pmax, ramp rate, fuel type, resource adequacy status, ancillary service capabilities (AGC, spin, non-spin), use limitations, start-up information, etc. This guide provides instruction on using features of the Master File User Interface. 3 Registered Costs ted Resources using the Registered Cost methodology, the CAISO will use the Costs as registered in the Master File as the Default Commitment Cost Bids. If there are questions The Master File is a general repository of quasi-static data needed to operate and support the CAISO Markets. Aug 16, 2024 · The California ISO manages the flow of electricity across high-voltage, long-distance power lines, operates a competitive wholesale energy market, and oversees transmission planning. New/modified application/report: Changes that cause addition/modification of ISO systems or reports, especially when data input is required by the customer 10. . Master File ProcessYou are offline. “Natural Gas” includes Alamitos Unit 7 (675 MW) and The Master File is a general repository of quasi-static data needed to operate and support the CAISO Markets. The data is used by CAISO market systems for bidding, operation, and settlement. February 13, 2007 CAISO/DMM 11 Option C: Start-up Cost Curve – Steam Turbines Units Source: Preliminary calculations based on data in CAISO Master File, assuming $8. The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. Scheduling Coordinator Agreement. Longer term, the CAISO indicates that integrating resource-specific values into the Master File is the “most desirable and lasting” alternative. ), User Interfaces (UI), Application Programming Interface (API) / Web Service. Background The Compliance Order found the CAISO tariff generally complies with Order No. All NQC values are “September NQC” and subject to change based on counting rules. Potential buyers of TEA rights will coordinate with CAISO (Master file) to pre-register resources they wish to use when purchasing TEA rights. Three stakeholders supported use OMS to capture distribution-level charging constraints, at least as a near-term solution. It also delivered automated subordinate aggregate capability constraints (ACCs) to support hybrid configurations. 0 to production today, which includes updates to the User Interface (UI) and Application Programming Interface (API) with new templates and new validation rules. If 2-party, enter Agreement number below (i. The survey submittals of Hybrid resources showed a total of 738 M Jun 2, 2025 · stribution-level resources in the Master File to resolve the ISO’s operational concerns. 9. Resource ID: The Resource_ID of the resource subject to the resouce control agreement as the Resource_ID is stored in the CAISO Master File (MF). com) • CAISO staff is available for meetings with individual stakeholders. The CPUC Energy Division requests that generators contact CPUC Energy Division staff with updates if they would like to use values other than the included default values. 3 Biddable parameters capture dynamic characteristics, and Master File parameters capture relatively more static characteristics. The Master File contains data that remain unchanged for relatively long periods of time. Specifically, “Energy Division is authorized to solicit informal feedback from parties, compare feedback from generators with information in CAISO’s Master File, and incorporate corrections and feedback into the MRD, as warranted. Our requirement programs are intended to complement the state's efforts to implement resource adequacy programs. Also shown is a projection of future new resources based on contracts in place by March 2024. Changes in availability reducing the maximum output or minimum output capability by at least 10 MW or 5% of the absolute value of the maximum or minimum output values registered in the Master File (whichever is greater), or the maximum continuous energy limit or minimum continuous energy limit of at least 5% of the maximum or minimum continuous nt dates, and location. Processing of requests for Master File data changes, except the changes related to registered cost updates, will be frozen for effective trade dates February 14-21 as a part of the implementation of this new model. Master File (MFRD) provides ISO with the ability to store market participants’ operating parameters data, which is then used in many of its applications. Page 7 of 308 Other Control Areas – Load forecasts for some control areas are necessary because their detailed networks are included in the Full Network The $/MWh value will be registered in the Master File and must be approved by the CAISO as described above in the Registration section D. nia ISO may investigate deviations with repeated or adverse behavi Formal notification of non-compliance sent to applicable entities. com. It includes submitting RDT data updates using GRDT or IRDT data, and steps for viewing statuses of uploaded RDT requests. Resource’s Interconnection Agreement + Participating Generator Agreement. 420. Nameplate Capacity is shown as “Net Dependable Capacity” in the CAISO Master Generating List file. Finally, DMM requests that resources using the dynamic limit would be ineligible for real Feb 17, 2023 · CPUC Energy Division has requested the ISO to issue a notice regarding the posting of the draft CPUC Master Resource Database, which is available here. If a Generating Unit or Dynamic System Resource is awarded RUC Capacity, the order in which the non-compliance RUC Capacity is apportioned is as follows. The authorized Scheduling Coordinator (SC) can submit a request to update specific operating parameters for existing generator or intertie resources. Operational data for those generating units come from the corresponding CAISO Master File, a confidential data set with unit-specific operational attributes. Access for the various systems is requested once Master File is updated with an ef The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. Master File has the meaning set forth in the CAISO Tariff. Dec 6, 2024 · How ramp rate curve submissions work in CAISO CAISO’s ramp rate submissions are tightly integrated with its Master File system. This is a compli r the applicable systems. Online resource data was drawn from the CAISO Master Generating Capability Lists as of January 2024. Additional documentation for the Western Energy Imbalance Market and RC West specific applications can be found within their The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. $0 $50 $100 $150 $200 $250 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Total Capacity (Steam Turbines) S t a r t u p Deleted: All information provided to the CAISO regarding the operation and technical constraints in the Master File shall be accurate and actually based on physical characteristics of the resource. com with the following information: Location of bus, and total MW. The flexible ramping product2 was introduced into the real-time market to manage ramp capability caused by load and variable energy resources uncertainty that materializes between market runs. Feb 10, 2025 · • Please submit written comments on the February 10, 2025, workshop by Tuesday, February 25, 2025, through the ISO’s commenting tool using the link on the working group webpage: California ISO - Resource adequacy modeling and program design (caiso. Mar 25, 2025 · The Market Results Interface (MRI) - Settlements application provides Scheduling Coordinators (SCs) with the ability to access, view, and download settlement files. The Export/Import Bids may be in the form of a Self-Schedule and/or an Economic Bid. The CAISO is requesting Scheduling Coordinators (SCs) for resources to provide contractual data for their resources for this summer. Sep 5, 2024 · The California ISO manages the flow of electricity on high-voltage power lines, operates a wholesale energy market, and oversees infrastructure planning. yvc cwp qhjgk dhnx odknu qxfzc lxymcv kzz ghlho mgblywa jxcvy pimx wegnwd btzujn ykhorbv